Repair of the path of Khamis Mushit Najran road by creating a number of lanes with shoulders and also scraping and re-asphalting it with a thickness of 5 cm total length of repair areas (48,496) km total length of scraping areas (14,609 km). Thus, the length of the adjusted working range (63/106.25) is 1 km