Completion of the road mansba /tina with al-Sitaa branch (phase 1) within the scope of the work of the project completions of some roads in The Asir area

  • slide
  • slide
  • slide
  • slide

Project Details


  • Project Name Completion of the road mansba /tina with al-Sitaa branch (phase 1) within the scope of the work of the project completions of some roads in The Asir area
  • The Owner Of The Project Ministry of Transportation
  • The original contract value 50.840.150


Brief Project Description


Complete the route of the position/hypnotic with the Branch al-Satiba (phase 1) length (13) instead of (15) km from the station (13+600) to the station (26+600) according to the design plans and the approved cross section.