Completion of the road mansba /tina with al-Sitaa branch (phase 1) within the scope of the work of the project completions of some roads in The Asir area
Project Details
Project NameCompletion of the road mansba /tina with al-Sitaa branch (phase 1) within the scope of the work of the project completions of some roads in The Asir area
The Owner Of The Project Ministry of Transportation
The original contract value50.840.150
Brief Project Description
Complete the route of the position/hypnotic with the Branch al-Satiba (phase 1) length (13) instead of (15) km from the station (13+600) to the station (26+600) according to the design plans and the approved cross section.